SPC Flooring Installation: DIY or Professional? Step-by-Step Guide

Keywords: SPC flooring installation, click-lock flooring, floating floor
Outline:
-
Pre-Installation:
-
Subfloor preparation (must be clean, dry, and level).
-
Acclimatize planks (24–48 hours).
-
-
Installation Steps:
-
Underlayment (if needed).
-
Click-lock system (tips for tight seams).
-
Cutting planks (use a utility knife/jigsaw).
-
-
DIY vs Pro: When to hire an expert (complex layouts, uneven subfloors).
-
Maintenance Tip: Avoid water seepage at edges.