Блог

SPC Flooring Installation: DIY or Professional? Step-by-Step Guide

Keywords: SPC flooring installation, click-lock flooring, floating floor
Outline:

  • Pre-Installation:

    • Subfloor preparation (must be clean, dry, and level).

    • Acclimatize planks (24–48 hours).

  • Installation Steps:

    • Underlayment (if needed).

    • Click-lock system (tips for tight seams).

    • Cutting planks (use a utility knife/jigsaw).

  • DIY vs Pro: When to hire an expert (complex layouts, uneven subfloors).

  • Maintenance Tip: Avoid water seepage at edges.

Добавить комментарий

Ваш адрес email не будет опубликован. Обязательные поля помечены *